Integral Management were recently asked to help BAM Construction with the management of the External Façade Sub Contract package at the new Aston Student Village development in Birmingham.
The entire external package, from roof level to ground floor doors, was let as a single sub contract package, value in excess of £3.5m. The external wall consists of a metsec frame and CP board. A number of different external finishes are being used, Terracotta Tiles, High Pressure Laminated panels, different colour Render and an interlocking Zink panel system. Glazed curtain walling is also being used to the stair cases and ground floor entrance screens.
Working closely with both BAM Construction and the Sub-Contractors management team, Integral were charged with managing the logistics of the facade package and an overview of the installation programme.
The external façade package is due to be completed in April 2013.
Integral Management were very pleased to be requested to undertake this short term Project Management role by BAM for this challenging cladding and glazing contract.
If we can assist you with any type of similar project, please do not hesitate to contact us on 0844 588 7188, we look forward to hearing from you.