Integral Management has been engaged in the management of the refurbishment of the external facade of two 15 story tower blocks in the centre of Macclesfield, south of Manchester
The project consists of 2.5 m projection Brise Soleil and 12 m long Feature Finials which are in the process of being installed to a total of four separate elevations per block. The project has had its challenges in design, and logistics not to mention Macclesfield’s unusual windy conditions which restrict the safe use of the Mast Climber access.
We are delighted that the project is nearing completion……….we will keep you posted when the final pressing is installed