Client - Curtain Walling Specialist Sub Contractor

Main Contractor - ISG Pearce, £220m principle contractor

Location - Ealing, West London

Material - External Curtain Walling, Sliding Folding Vehicle Access doors, Steel Personnel Access doors, Steel Roller Shutters, Timber Brise Soleil

SAM_0511

Assignment Details

  • To closely manage the installation package including design, procurement and on site installation coordination with Sub Contractors
  • Negotiate and engage Sub Contract packages
  • Review and agree on site installation programme with Main Contractor and other Sub Contractors
  • Format and issue all Health and Safety project documentation
  • Monitor and report on site installation budget

Project Challenges

  • The variety of non standard items included in the package required in-depth design discussions with a variety of Sub Contractors to ensure the various products coordinated with each other
  • This coordination was also required at the programming, logistical and on site installation stages of the contract
  • We worked closely with the Main Contractor and other Sub Contractors involved in the project to coordinate the design and installation programme
  • Due to the nature of the client we worked within very short time frames which required close communication and liaison at all stages of the contract
  • On site glazing of the 3m x 4 m toughened and laminated double glazed sealed units was undertaken by a specialist glazing company utilizing mechanical lifting equipment

Project Results

  • The final installation of the various products works well aesthetically
  • The various products function well together to give a fictional working environment for the end user
  • On Budget