Client -

Main Contractor - Lambourn Contracts, a leading independent construction company, operating across London and throughout the South East

Location - North London

Material - Steel and Aluminum Prefabricated Roof light, SKN 165 Coolite toughened and laminated double glazed sealed units

WHA 9.7.10

Assignment Details

  • Integral Management were engaged by Lambourn Contracts to manage the design, procurement, delivery and installation of this bespoke designed fully slide operable Glazed Roof light for a very prestige client in North London
  • Negotiate and engage site installation company
  • Manage all Health & Safety aspects of the package
  • To see a video of the roof in action click here

Project Challenges

  • Following the demise of the original sub-contractor, Integral Management were employed to manage the detailed process of ensuring the bespoke structure
  • In depth discussions with the project Architect and the US Roof light supplier were necessary to ensure the end client’s exacting details were achieved
  • There were numerous specific requirements for the size and operability of the roof not least that it was to be manually operated unlike the usual mechanical device which would be associated with a roof of this size and weight
  • We liaised with Lambourn Contracts on site team to ensure careful programme coordination and installation were achieved
  • We have to manage and coordinate numerous changes throughout the design process
  • We liaised with the suppliers import company to negotiate all HM Customs & Excise regulations were adhered to
  • We liaised with the suppliers import company to negotiate all HM Customs & Excise regulations were adhered to
  • The prefabricated Roof light was built in-situ on the structural roof
  • When open, the roof light creates a clear opening of 4000 mm x 5500 mm which we believe is the largest single opening roof light installed in the UK

Project Results

  • Due to our tireless efforts to ensure the design and delivery particulars were managed to the last detail, the end product is stunning
  • Variations on the contract amounted to less than 1 % of the original contract value
  • Folloing the succes of this project Integral Management have since been involved in other similar contracts following the success of this installation