This relatively small but demanding project in north London, was recently completed for one of our facade clients. The project included full height Curtain Walling screens, steel personnel doors, sliding folding access doors, steel roller shutters and external timber Brise Soleil. A remote on site glazing crane was required to safely install the 3m x 4m toughened and laminated double glazed sealed units.
The variety of products presented a challenging procurement procedure and required careful programming. We were also responsible for managing, with the Main Contractor, the preparation of all work areas to ensure they were made ready in good time, and that the products were installed in the correct sequence to ensure the building was closed up and became functional for the end user within the agreed tight programme timing. Integral Management worked closely with the design and procurement departments of our client to achieve this. Good working relationships were also established with the various Sub Contractors to ensure this challenging project was delivered on time and within budget.